Building an industrial building involves following certain steps and carrying out many administrative and other steps. Whether you decide to go through an architect or a builder who will guarantee you a turnkey project, the phases to be respected remain generally identical. The main steps mentioned below are in the general case. They may differ depending on the project.
DEFINITION OF THE CONSTRUCTION PROJECT AND IMPLEMENTATION OF THE BUILDING
The first step is to determine a project that meets your needs, expectations and financial constraints while choosing a geographical area for the establishment of your industrial building.
THE FEASIBILITY OF THE PROJECT
This first major step in the construction of an industrial building involves several phases.
- Exhibition of the
BEATI project has a project owner and an architect who will collaborate in the construction project of an industrial building. The client will thus expose the client’s project to the architect. It is then that the latter can help him to achieve it in the best conditions.
He will inform him particularly about the conditions relating to the land, the construction, the functions of the building and the steps required. - Sketch studies
Following the results of its first feasibility study, the BEATI architect made a first sketch study taking into account the parameters related to the land, the construction options and the allocated budget. - The pre-project studies, AVP
If the project owner proceeds, on behalf of the client, to the project of sketch, the architect pursues his studies of preliminary draft: APS, Preliminary-draft-summary ( precise description of the different options, estimation of the costs and the duration) and APD, preliminary draft-final (last adjustments taking into account the options selected by the contracting authority notably the choice of materials and technical services in conformity with Thermal Regulation 2012, RT 2012). - Application for a building permit
As part of a building permit application, the BEATI company is responsible for providing an architect who will put together the entire file containing the technical documents, plans, material definitions, networks and fluids, as well as administrative and legal documents. The architect, in collaboration with the building owner, follows the building permit file and brings any additional rooms required until the permit is obtained.
DETAILED DESIGN OF THE ARCHITECTURAL PROJECT
This step is for BEATI to put in place the expertise and professionalism of the architect to develop the detailed plans of the future industrial building to ensure the understanding of the entire construction project. During this phase, the design offices selected by the architect and the client, ensure the regular development of the defined action plan.
PLANNING THE CONSTRUCTION OF THE INDUSTRIAL BUILDING
In order to carry out a planning of the construction of the industrial building, BEATI undertakes to provide an architect who will carry out studies and implementation plans:
- the business consultation file detailing the technical and administrative characteristics of each batch of the construction project, and estimating the respective budgets. This document also makes it possible to specify the framework of intervention of the companies as well as their relations with the owner and the architect.
- the execution plans, which define the technical realization of the construction project: plans, calculation notes and specifications allowing the execution of the works.
CHOICE OF COMPANIES
Various tradespeople work on the construction of an industrial building. BEATI’s mission is to choose the architect or the client who will consult the various companies able to intervene on the project, and analyze the offers proposed by the craftsmen. Once selected, companies contractually commit to costs and deadlines.
ON SITE
The project manager intervenes to ensure a good organization on the building site and an execution according to the phases of construction of the industrial building: the earthworks and the connection to the road network and the various networks, the carcass work (foundations , structures) and the second work (sealing, aesthetics, comfort).
BEATI undertakes the scheduling and on-site planning that intervene in addition to the project management. It aims to plan the interweaving of the different interventions of each company to optimize costs and deadlines.
The construction of the completed industrial building, the architect or the turnkey builder, controls all the works, attests to the taking into account of the thermal regulation 2012, and balance the account of the building site.
The delivery of the building can then be done.